LIVE STATUSTata fab past halfway·Airport ~80%·Solar 300 MW live·Rail CCEA-approvedas of Jul 2026
Home / Updates

Dated updates

A sourced, reverse-chronological feed. Each item is tagged and dated. Refreshed monthly.

Dholera generates a lot of headlines, and most of them are noise until you connect them to the ground position. This feed keeps the dated trail in reverse-chronological order, tags each item by source so you can tell a cabinet approval from a press target at a glance, and links each one to the mega-project it affects. The pattern that matters is not any single announcement but the accumulation, and specifically the transitions: announced to under construction, under construction to operational. Those are what actually move the value of land and the case for building here. Use the feed to track whether a story is followed by a verifiable next step rather than a fresh press release.

How this page is sourced

Everything on this site is held to one standard so you can trust it enough to act on. Every figure is tagged by where it comes from: green for government or official sources, amber for national or trade press, and red for broker or unverified claims, which we flag rather than repeat as fact. Every figure carries a date, because Dholera moves and a number that was right last year may not hold now. Anything framed as a future event, an opening, a first chip, a completion, stays labelled as a target until a government source confirms it happened. We do not sell plots, we do not publish invented reviews or registration numbers, and where a fact is not reliably available we say so instead of guessing. The full method and the primary sources are on the sources and methodology page.

Read the tags as a confidence meter. A green figure is something you can plan against today. An amber figure is credible but worth confirming before you build a decision on it. A red figure is a claim we are showing you so that you can recognise it, not one we stand behind. When two sources disagree, we say so and show the more authoritative one rather than averaging them into a number that is nobody's actual figure. The point of all of this is simple: you should be able to act on what you read here, and check any of it yourself, without wondering whether a number was quietly invented to make the picture look better than it is.

2026-07-17 · Press

Tata fab to start on 90nm, 28nm to follow

Reporting (India Today, 17 Jul 2026) says Tata's Dholera fab will begin at the 90nm node with 28nm later, and ...

2026-07-15 · Press

Airport reported ~80% complete, Oct 2026 target

After a Union Civil Aviation Ministry review, Dholera airport is reported ~80% complete with operations target...

2026-07-09 · Press

Gujarat launches its first Data Centre Policy

The Viksit Gujarat Data Centre Policy 2026-29 targets over Rs 6 lakh crore and 7.5 GW state-wide, naming Dhole...

2026-05-17 · Govt

Tata Electronics and ASML announce partnership

Tata Electronics announced a strategic partnership with ASML to equip its 300mm Dholera fab, confirmed on the ...

2026-05-13 · Govt

CCEA approves the Ahmedabad-Dholera semi high-speed rail

CCEA approved the Rs 20,667 crore, 134 km semi high-speed double line, India's first, targeted for 2030-31 (PI...

2026-04-14 · Press

Centre notifies a 66-hectare Tata Semiconductor SEZ

The Centre notified a 66-hectare semiconductor SEZ in Dholera for the Tata fab, with work likely to commence b...

2026-03-31 · Press

Ahmedabad-Dholera expressway reported operational

The 109 km greenfield expressway is reported inaugurated and operational, cutting travel time to Ahmedabad to ...

2026-02-20 · Govt

Gujarat signs L&T-Vyoma AI data centre in Dholera

Gujarat signed an agreement with Larsen & Toubro-Vyoma to build an AI data centre in Dholera (newsonair, 2...

2026-02-18 · Press

Gujarat Budget earmarks Rs 610 crore for Dholera

The Gujarat 2026-27 budget earmarks Rs 610 crore for Dholera SIR trunk and logistics infrastructure, partly vi...

2025-05-02 · Govt

CM reviews Dholera progress

A Chief Minister's Office review reported about 95% of the Ahmedabad-Dholera expressway complete at that time,...

2024-03-01 · Press

Ground-breaking at the Tata fab site

Construction of the Tata Electronics fab began at Dholera in March 2024 following the Cabinet approval....

2024-02-29 · Govt

Union Cabinet approves the Tata Electronics fab

The Union Cabinet approved the Tata Electronics-PSMC semiconductor fab at Dholera under the India Semiconducto...

2023-07-10 · Press

Vedanta-Foxconn joint venture collapses

Foxconn withdrew from its semiconductor joint venture with Vedanta on 10 July 2023. The widely-cited $19.5B wa...

2021-09-21 · Govt

Bhimnath-Dholera freight line approved

The NICDIT board approved the Bhimnath-Dholera freight rail line on 21 September 2021, connecting the SIR towa...

2018-04-01 · Press

Dholera ultra-mega solar park approved

The Dholera ultra-mega solar park was approved around April 2018, later targeting 5,000 MW with a 1,000 MW Pha...

2016-01-28 · Govt

DICDL, the city SPV, incorporated

Dholera Industrial City Development Limited was incorporated on 28 January 2016 as the special purpose vehicle...

2014-09-19 · Govt

Environmental Clearance granted

MoEF&CC granted Environmental Clearance for the Dholera SIR project on 19 September 2014, per the NICDC le...

2009-01-01 · Govt

Gujarat SIR Act passed

The Gujarat Special Investment Region Act 2009 created the legal framework for Dholera and other special inves...