Embraer and Adani aircraft assembly in Dholera: what is confirmed and what is not

Updated 11 November 2026. Compiled by the BuildInDholera desk from the sources listed at the end of this page.

Not confirmed. Embraer and the Adani Group signed a memorandum in January 2026 to explore a regional jet final assembly line in India by 2028. Press reports in June 2026 say Dholera is the chosen site, but neither company has confirmed it, and Embraer's chief executive has tied the plant to about 200 firm orders. Dholera airport is not yet open.

The Embraer and Adani plan, checked point by point

QuestionWhat the record saysStatus (13 Nov 2026)Source and date
Is there an agreement?Embraer and the Adani Group signed a memorandum on an integrated regional aircraft ecosystem, with Embraer supplying engineering and manufacturing expertise and Adani its aviation businesses.Memorandum signed, January 2026. It is not a binding order or a licence.Press reports, January and March 2026
Is Dholera the site?Gujarat (Dholera) and Andhra Pradesh (Bhogapuram) were reported as rivals in January 2026. In June 2026 reports said Dholera had been finalised.Reported, not confirmed by either companyDeshGujarat, Swarajya, PSU Watch, June 2026
When would it start?A final assembly line in India by 2028 in a joint venture with Adani, reported by ANI in March 2026.Target onlyANI via Asianet Newsable, March 2026
What condition was attached?Embraer's chief executive said the line needs firm orders for about 200 aircraft to make commercial sense.Condition stated, no order book reportedOutlook Business, 2026
Which aircraft?Regional jets. One trade report names the E175. Embraer has more than 15 supply chain partners in India already.Model not confirmed by the companiesiDRW; ANI reports
Is the airport ready?Runway of 3,200 m, first trial landing on 4 June 2026, operations expected by end of 2026, no aerodrome licence reported.Airport not openChief Minister's review, 16 October 2026

Download this table (CSV). Last checked 11 November 2026. Free to quote with a link to this page.

What was actually signed

A memorandum is an agreement to explore, and it commits neither company to build. The January 2026 memorandum set out a plan for a regional aircraft ecosystem: Embraer brings aircraft design and production know-how and Adani brings airports, aerospace manufacturing and maintenance businesses. No investment figure, land allotment or plot number has been published in the reports we hold.

What the memorandum covers, in its own words

The Embraer release of early February 2026 says the partnership aims to build an integrated regional transport aircraft ecosystem in India. It starts with an assembly line and then raises local content over time. The areas named are domestic aircraft production, post-delivery support and services, supplier network development and pilot training. The release names no site and no investment amount, which is why the Dholera reports remain reports.

Why Dholera is mentioned

Dholera International Airport has a 3,200 m runway and sits inside a Special Investment Region with industrial land set aside for manufacturing. Our record shows 1,043 acres of industrial land available for allotment on 30 June 2026 (NICDC report). A final assembly line needs a runway beside the factory so that finished aircraft can be flown out, which is the reason sites with an airport on the plot are shortlisted. The June 2026 reports say Dholera was chosen over Bhogapuram, but they rely on unnamed sources, and the companies declined to comment.

The 200 aircraft condition

Embraer's chief executive has said the assembly line depends on about 200 firm domestic orders. That is the condition that will decide whether the plant is built, and it is separate from the site question. We found no report of orders at that size. Until one appears, treat the 2028 date as the earliest the companies have named, not a schedule.

The order of reports so far

January 2026: the memorandum is announced, with Dholera described as the frontrunner against Bhogapuram in Andhra Pradesh. March 2026: ANI reports Embraer's aim of a final assembly line in India with Adani by 2028. June 2026: several outlets report that Dholera has been finalised, again citing sources. Between June and 13 November 2026 we found no company statement, no investment figure, no land allotment and no order announcement. Each new report so far repeats the earlier ones, which is why this page stays at Not confirmed until a company or the state government says otherwise in its own words.

If you supply parts, tooling or services to aircraft makers, the useful reading of this record is that nothing needs to be built for it yet, and that the first public signal worth acting on will be a land allotment or an order, not another press report.

What a supplier or investor should check

  • Whether DICDL has allotted land to Adani or Embraer, which would appear in the NICDC monthly report. Our record shows none to either company.
  • Whether the airport has an aerodrome licence, which is needed before test flights can be a regular activity.
  • Whether an order announcement, not a press report, follows the memorandum.
  • Whether the plant would sit in the airport zone or in an industrial zone, since the allotment terms differ.

How this fits the rest of Dholera's manufacturing plan

The Tata Electronics fab is under construction with commercial production reported for mid-2028, so an aircraft line would be the second very large plant in the SIR. The semiconductor plan is far ahead of this one: it has a Cabinet approval, a site and a contractor at work, which is what this plan still lacks. Compare the two on our announced investment by sector page.

What this page cannot tell you

This page records reports and statements to 13 November 2026. It cannot tell you whether an aircraft plant will be built, where in Dholera it would stand, or how many jobs it would create.

Questions people ask

Is Embraer setting up a plant in Dholera?

Not confirmed. Embraer and the Adani Group signed a memorandum in January 2026, and June 2026 press reports say Dholera has been finalised as the site, citing sources. Neither company has confirmed the location. Embraer has said it needs about 200 firm orders before the line is viable.

When will the Embraer Adani assembly line start?

The companies have named 2028 as the aim for a final assembly line in India, according to ANI in March 2026. That is a target tied to an order condition, not a construction schedule, and no construction start is reported.

Which aircraft would be built in Dholera?

The reports speak of regional jets. One trade outlet names the Embraer E175. The companies have not published the model, the annual output or the number of jobs, so treat any specific figure on those as unverified.

Could aircraft be assembled before Dholera airport opens?

A final assembly line sends finished aircraft out by runway, so it depends on the airport being licensed. Dholera airport is not open as of 13 November 2026; officials expect operations by end of 2026, and no aerodrome licence has been reported.

Has Adani or Embraer been allotted land in Dholera?

Not in our record. The NICDC report of 30 June 2026 lists 14 allotted plots of 545 acres, with Tata Chemicals the named industrial anchor, and does not name either company. Land allotment is made by DICDL, which publishes it in its reports.

Read next

Sources

  1. Embraer and Adani Defence & Aerospace, release on the regional transport aircraft ecosystem (as published by AviationPros) (4 February 2026)
  2. Outlook Business, Embraer final assembly line contingent on 200 orders (2026)
  3. PSU Watch, Adani Group and Embraer finalise Dholera (June 2026)
  4. Asianet Newsable (ANI), Embraer and Adani assembly line in Gujarat by 2028 (March 2026)
  5. DeshGujarat, Adani-Embraer JV eyes Gujarat or Andhra (2026)
  6. NICDC Delivery Monitoring Unit report (30 June 2026)